March 14, 2023

Updates:

March 14, 2023 Line Tripping

Time started 7:10PM

Restored 8:40PM

Areas affected:

Section supplying to Bugash St. going to Pilayre St., and part of CPG East Ave going to Habitat located in Bool Dist.

At around 7:45pm the whole area of Feeder F experienced line tripped off and was restored at around 7:48pm.

Caused: Sparking Transformer

Areas of Feeder F – along L. Alba St. of Dampas Dist., to Banat-i Hill Road, Mansasa-Banat-i Road, G. Sanchez St., CPG East Ave. going to Katipunan St., E.K. Inting St., V.P. Inting St. going to whole of Bool Dist. and from CPG East Ave. going to Saint Joseph Cathedral down to Gallares St. up to PPA or Pook Pantalan and its nearby residences.

For information and guidance.

Thank you.

Share

November 8, 2022-Unscheduled Power Interruption

As of 11:51 of November 8, 2022, a line tripping occurred affecting the whole area of Feeder Delta.

Caused of Tripping: Broken Pin Insulator located near Civil Service Office, Circumferential Road, Poblacion III, Tag. City.

Affected Areas:
Feeder Delta 1 (Restored 12:20pm)
From Dampas Church to Bantol St. going to Rajah Sikatuna Ave., to J.A. Clarin St. and from APC to Janseen Heights; Along R. Enerio St. from LTO going to Dampas Dumpsite, Along Calceta St., Rizal St., F. Torralba St., G. Lamdagan St., Aumentado Road, Sacred heart Village and part of B. Inting Extn and it’s nearby residences.

Feeder Delta 2 (restoration will be after the replacement of broken insulator)
From Dampas Brgy. Hall along Jose Go St., M.Parras Etxn., Tamblot Circumferential Road from cor. Hontanosas St. to cor CPG Ave. and part of B. Inting Extension from cor. Tamblot to cor. F. Torralba St.; CPG Ave cor Tamblot to cor. Calceta St.; along B. Aquino St. Airport Road,part of Pamaong St.; Booy Annex going to T. Cloma Ave., Booy Dist. and its nearby residences.

UPDATES:

As of 11:51 of November 8, 2022, a line tripping occurred affecting the whole area of Feeder Delta.

(FULLY RESTORED 1:49PM)

Share

September 6, 2022

Updates to BLCI’s Unscheduled Power Interruption

Date: September 6, 2022

At around 4:47am, there was an outage occurred to Feeder A, C, E, and F areas. The SF6 Breaker at the Sending End was trip off due to the electrocuted snake at sub-transmission line in front LTO.

It was successfully restored at around 6:30am.

For information and guidance.

Thank you.

BLCI Management