BLCI’s Update as of December 31, 2021

Bohol Light Company Inc. (BLCI) has three (3) substations with five power transformers. Out of which, only one (1) substation which supplies two (2) feeders can receive and distribute power any time the National Grid Corporation of the Philippines (NGCP) can transmit power from Bohol Power Plants.

As of 5:45pm of December 31, 2021, BLCI is still on standby mode awaiting for the power to be supplied from Power Barge (PB) 104 through NGCP’s transmission facilities going to BLCI’s substation.

According to the NGCP Area Control Center, the energized 69kV line is still up to Garcia Hernandez (Ubay-Alicia-Garcia) only. A minimum load is required to support PB 104’s stable operation. Only when its system would be stabilized can the Garcia-Tagbilaran 69kV Line be energized. However, current power consumption is still insufficient as of the moment.

With this, BLCI cannot give the precise time as to when the power supply will be transmitted to our system.

We humbly request our dear consumers to extend your patience as we welcome the New Year 2022.

Thank you for your understanding. Still, we wish everyone a Happy New Year!

From: BLCI Management

Share

BLCI’s Update as of December 28, 2021

Work Activities: Replacement and Correction of Backbone lines.

For Feeder Delta 2

– K of C Drive, Poblacion II, 100%

-V.P. Inting St. near Acasia de Bubu, Poblacion 1 -100%

For Feeder Eagle

– Cainggit Drive, Cogon Dist.-100%

For Feeder Foxtrot

-Dangoy St., Bool Dist-100%

-V.P. Inting going to Ocean Suites, Bool Dist. -80%

For Feeder Hotel

-Upper Salazar St., Ubujan Dist. -100%

BLCI would like to express its sincere appreciation to ALECO/APEC & MERALCO Teams who voluntary help BLCI in the repair of its Distribution Line System.

From: BLCI Management

Share

BLCI’s Update as of December 27, 2021

For Feeder H

– Replacement and Correction of Backbone Lines.

– Kabangkalan Rd., Cabawan Dist -100%

-Tiptip to Manga Rd. -100%

– Esabo Rd., Tiptip Dist.-100%

-Dagohoy Rd., San Isidro Dist-100%

-Jumamil & Matuod St., Manga Dist. -100%

-Penaflor St., Taloto Dist. -100%

BLCI would like to express its sincere appreciation to ALECO/APEC & MERALCO Teams who voluntary help BLCI in the repair of its Distribution Line System.

From: BLCI Management

Share

BLCI’s Update as of December 26, 2021

For Feeder G – Replacement and correction of primary line activities

– Casa Road, Tiptip District to Cabawan Road -100%

-Tiptip to Manga Road-100%

-Tiptip to San Isidro Road -100%

– Zamora St., Dao Dist. to Taloto Dist. -100%

-Taloto to Manga Coastal Road -100%

BLCI highly appreciate the voluntary support from ALECO/APEC and MERALCO Teams. Thank you for doing a great job. Moving forward nga “Ang kahayag diri Tagbilaran mapaabot sa tanan”. We request everyone to extend your patience.

From: BLCI Management

Share

BLCI’s Update as of December 25, 2021

For Feeder Delta-2 (along Gallares St. near Lite Port) Replacement of one (1) Primary pole with deformed crossarm 100%

For Feeder E – (along Graham Ave., near Depot) Replacement of four (4) Broken Poles 100%

To Meralco Team, thank you very much for your willingness to helped that you had extended not only to BLCI but to all Tagbilaranons. With your support, the hope for an early power restoration to Tagbilaran City might come closer to possible.

Merry Christmas to your team even if you are spending this special season far away from your families.

A Big Thanks from BLCI Management.

Share

BLCI’S Update as of December 24, 2021

For Feeder D – (Mansasa-Dampas road near Yakiniko) Replacement of unsafe primary poles 100%For Feeder F – (G. Sanchez St , Mansasa Dist) Replacement of broken poles 100%

For Feeder G – (along P. Castillo St., and near Kag. Neri at Dao Dist.) Replacement of broken poles 100%

For Feeder H – (C. Darunday St. near Cornell St., Dao Dist.) Replacement of broken poles 100%

Note: All work activities focused first to the repairs of backbone lines. Dugang mga pahibalo among ipaabot kaninyo.Daghang salamat sa makanunayong pagsabot.

Gikan sa Buhatan sa BLCI

Share

BLCI’S Update as of December 23, 2021

Ang namunuan sa Bohol Light Company, Inc. (BLCI) inubanan sa suporta gikan sa kadagkuan sa syudad sa Tagbilaran ug sa namunuan sa probinsya sa Bohol, kami nasayud unsa ka pait ang mawad-an ug kurenti, walay tubig, walay signal ug uban pa.

Si BLCI walay hunong sa pagtrabaho sukad pa niadtong December 17, 2021 pagkahuman sa bagyong Odette hangtud karon. Nagpahigayon dayon kita ug actual inspections on site ug assessment sa mga damages, paghinlo sa mga poste nga nakaharang sa atong mga kalsada ilabina ngadto sa atong mga main roads and highways. Sa ingon niini, makapahigayon si BLCI sa pagpabarog ug balik sa atong mga nabali nga poste sa kurente ug pagladlad sa atong mga naputol nga linya.

Karong adlawa, December 23, 2021, mapasalamaton ang BLCI sa mga niabot nga grupo gikan sa MERALCO nga bulontaryong nitabang para mas mapadali ang restoration sa atong Distribution Line System.

STATUS OF WORK ACTIVITIES

Clearing Operation to Main Roads and Highways – 85%

Repairs of damages (Erection and Stringing of Lines) – 10%

Correction of Leaning Poles – 90%

Aduna na kitay duha ka feeders nga andam nga mudawat ug supply sa kurente. Kini mao ang Feeder Alpha (from R. Enerio St. near LTO to J.A. Clarin St. to Plaza Rizal and to CPG North Avenue up to DCPNHS) and Feeder Charlie (from Gallares Hospital going to cor. M. Parras St. and J.A. Clarin St., going to Fil Oil Gas Station) anytime kon makatransmit ug supply ang NGCP gikan sa Power Plant dinhi sa Bohol. Ang atong e-prioritize mao ang mga essential establishments sama sa:

Hospitals

Pumping Stations

Water Refilling Stations

Gas Stations

Cell Sites

Radio Stations

Malls

Banks

Kami magahanyo sa inyong makanunayong pagsabot ilabina niining panahon sa trahedya.

Dugang mga pahibalo among ipaabot kaninyo. Daghang salamat.

Gikan sa Buhatan sa Bohol Light Company, Inc.

Share

PUBLIC ADVISORY

To: All Our Valued Clients/Customers

Date: December 18, 2021

Due to Supertyphoon ‘Odette’ which heavily hit Bohol having left extreme damages to Boholanos, power supply is totally shutdown.

After the inspection/assessment we conducted, we have found several broken and/or leaning poles, cut wires, and impassable and inaccessible roads. With all these, we need to clear all poles and wires obstructing the roads and highways, conduct rehabilitation of our Distribution System by ensuring that all feeders are up and running and make repairs first of all main lines, before the customers’ poles and wires are attended to.

However, please note that BLCI’s repair of its Distribution System should also go along with the repair of transmission lines of National Grid Corporation of the Philippines (NGCP). As of posting, NGCP is yet to release its official statement on its restoration schedule after completion of its damage assessment. With this, we also cannot give the precise timeline as to when power supply would be restored.

BLCI apologizes for any inconvenience this may cause you and we humbly request you to extend your patience. Rest assured that our men will be exerting all efforts to restore all lines as soon as possible.

Thank you for your understanding.

Sgd.

BLCI Management